The installation of the superstructure of the “Absheron Early Production Platform Complex” on the support block of the last AM01 module has been successfully completed.
“Azerbaijan Caspian Sea Shipping” CJSC (ASCO) “Azerbaijan” crane vessel with a lifting capacity of 2500 tons was involved in the delivery and installation of all 3 modules from the Baku Deep Water Jacket Factory (BDJF) named after Heydar Aliyev to the area where the support block is located.
asco.az