TAP completes directional drill underneath Axios River

    1013

    A 1820-meter directional drill underneath the Axios River in Greece has been completed as part of the construction of the Trans Adriatic Pipeline (TAP), which envisages transportation of Azerbaijani gas to Europe, TAP AG consortium said in a message on Twitter.

    “This engineering accomplishment ensures the wildlife habitat (plants and animal species) was not impacted,” said the consortium.

    TAP project, worth 4.5 billion euros, is one of the priority energy projects for the European Union. The project envisages transportation of gas from Azerbaijan’s Shah Deniz Stage 2 to the EU countries.

    Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP will cross Northern Greece, Albania and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network.

    The project is currently in its construction phase, which started in 2016.

    Once built, TAP will offer a direct and cost-effective transportation route opening up the vital Southern Gas Corridor, a 3,500-kilometer long gas value chain stretching from the Caspian Sea to Europe.

    TAP shareholders include BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).

    © Content from this site must be hyperlinked when used